# Notion Roadmap: Pick a Template by Shape or Build Your Own
- URL: https://notionsolutions.net/notion-roadmap/
- Published: 2026-11-19T09:00:00.000Z
- Updated: 2026-11-24T16:43:48.000Z
- Description: Pick a Notion roadmap by shape: timeline, Now, Next, Later, sprints or a public page. Compare 16 templates from the October 2026 sample, build your own in six steps, and check privacy before sharing with customers.
- Author: Kevin Turner
- Tags: template, Notion task workflows

**The Notion roadmap I'd start with is Notion's free [Product roadmap](https://www.notion.com/templates/notion-product-roadmap?ref=notionsolutions.net) template, or [Simple Roadmap](https://www.notion.com/templates/roadmap?ref=notionsolutions.net) if you plan in epics, sprints and bugs.** If neither fits, build your own on a projects database with a status and a date range, shown as a timeline and as a board grouped by status. Ratings barely separate the popular roadmap templates, so choose by the shape of your roadmap rather than by stars. Keep a public roadmap on its own published page, with a form for requests.

Dated launches across quarters call for a timeline. If your priorities have no firm dates, a Now, Next, Later board fits better. Engineering teams that work in cycles can run epics and sprints on a task database, and customers asking what's next get a separate public roadmap with a request form.

## Pick your roadmap's shape before the template

A roadmap in Notion is a database of items plus the views you put on it, so the shape decides which properties and views you need. Notion's own [guide to using Notion for product roadmaps](https://www.notion.com/help/guides/using-notion-for-product-roadmaps?ref=notionsolutions.net) stays at that level: each project gets its own page, customizable tags help organize the roadmap, and you can view it in many different ways. The ratings below come from an October 2026 comparison sample. Four shapes cover the common cases, and each one below names the marketplace listings that match it by listing title or description, with the rating and review count recorded in that sample.

[![Notion board with Now, Next and Later columns containing Client portal, Request intake and Reporting](https://storage.ghost.io/c/5c/30/5c30c46b-86a3-4d20-984f-4f6ae8ad1ed2/content/images/2026/11/notion-roadmap-board-20261119.webp)](https://storage.ghost.io/c/5c/30/5c30c46b-86a3-4d20-984f-4f6ae8ad1ed2/content/images/2026/11/notion-roadmap-board-20261119.webp?ref=notionsolutions.net)

Use Now, Next and Later when you can rank the work but cannot commit to dates. Drag a card to change its stage.

### Dated launches across quarters: a timeline roadmap

If every item has a start and an end, put the roadmap on a timeline. Notion's [help page on database views](https://www.notion.com/help/views-filters-and-sorts?ref=notionsolutions.net) describes the timeline as a way to plot project milestones so you can see when they're happening and how long they'll take to complete. Four of the work roadmap listings are timelines by listing title or description, and the most-reviewed is [Product Roadmap Timeline](https://www.notion.com/templates/product-roadmap-timeline?ref=notionsolutions.net), rated 4.825 from 40 reviews. Notion's own Product roadmap is a general roadmap by its listing title, rated 4.82 from 1,448 reviews, and its listing says: "Plan and track launches across any timeframe and at any level of detail."

### Priorities without firm dates: a Now, Next, Later board

When you can rank the work but can't date it, skip the timeline and use a board. Notion's [board help](https://www.notion.com/help/boards?ref=notionsolutions.net) says a new board is grouped by a status property by default if the database has one, so a status with Now, Next and Later options gives you three columns, and you drag a card between them as priorities change. To name those options, open the database settings menu → Edit properties → Status, then rename the options or add them with +. Only two listings use Now, Next, Later in their title, and neither has 10 reviews, so this is the shape I'd build on a status board rather than shop for. If you're deciding whether those stages belong in a Status or a Select property, the [Notion status vs select comparison](https://notionsolutions.net/notion-status-vs-select-project-tracking/) covers the difference for project tracking.

### Engineering work in cycles: epics and sprints

Teams that ship in sprints need tasks that belong to a cycle, on top of roadmap items with dates. Simple Roadmap, made by Notion, is the one listing built around that by its description: "Track all of your project work with this template. Organize all your tasks in epics, sprints, and bug reports." It's rated 4.901 from 131 reviews. Five more listings are engineering or development roadmaps by listing title or description, led by [Developers Project Roadmap](https://www.notion.com/templates/developers-project-roadmap?ref=notionsolutions.net) at 5.0 from 13 reviews. Notion's own sprint feature runs on a task database, and the [engineering section below](#engineering-roadmap) shows how to switch it on.

### Customers asking what's next: a public roadmap plus a request form

A customer-facing roadmap has a different audience from your internal one, so it gets its own database. Five listings are public roadmaps or feedback boards by listing title or description, and three of them have 10 or more reviews: [Public Roadmap with features & bug forms](https://www.notion.com/templates/notion-public-roadmap?ref=notionsolutions.net) at 4.711 from 45, [Webflow’s Public Roadmap](https://www.notion.com/templates/webflows-public-roadmap?ref=notionsolutions.net) at 4.92 from 25, and [Feedback to Roadmap](https://www.notion.com/templates/feedback-to-roadmap?ref=notionsolutions.net) at 4.542 from 24\. Whichever you start from, read the [publishing section](#public-roadmap) before you share the link, because a published database shows more than the one view you designed.

## Notion roadmap templates, by the numbers

The numbers in this section come from an October 2026 sample of user ratings and review counts on Notion's template marketplace: they show how people rated a listing, not whether its timeline or relations fit your work. They cover 102 listings with "roadmap" in the page address, drawn from Notion's [Product Roadmap](https://www.notion.com/templates/category/product-roadmap?ref=notionsolutions.net) and [Project Roadmap](https://www.notion.com/templates/category/project-roadmap?ref=notionsolutions.net) template categories, a marketplace search for "roadmap" and the listings that rank for the template query. Of the 102, 66 are work roadmaps; study plans, guided action plans or workbooks, and personal or life roadmaps were left out.

Sixteen of the 66 work listings have 10 or more reviews. Their median rating is 4.825, the range runs from 4.542 to 5.0, and together they hold 2,109 reviews; weighting each rating by its review count also gives 4.825\. All 16 were free in that sample, and only two show 5.0, on 16 and 13 reviews. The two made by Notion carry 1,579 of those 2,109 reviews, or 74.9%: Product roadmap at 4.82 from 1,448 and Simple Roadmap at 4.901 from 131\. Take them out and the other 14 keep the same 4.825 median and the same 4.542 to 5.0 range, from 530 reviews.

Widen the count to all 41 rated work listings and the median rises to 4.871, with a range from 1.0 to 5.0 across 2,188 reviews and a review-weighted mean of 4.819\. Seventeen of them show 5.0, but the most-reviewed of those has 16 reviews, and 15 of the 17 rest on fewer than 10\. Of the 66 work listings, 58 are free and 8 are paid, at a median of $7 and a range of $1.99 to $29; only 3 paid listings are rated, with 9 reviews at most.

By listing title or description, 41 of the 66 are general product or project roadmaps, 5 are engineering or development roadmaps, 5 are public roadmaps or feedback boards, 4 are timelines, 4 are marketing roadmaps, 4 are prioritization or scoring roadmaps, 2 are Now, Next, Later boards, and 1 is built around epics, sprints and bugs.

__The 16 work roadmap listings with 10 or more reviews in the October 2026 comparison sample, by review count (user ratings and review counts read from the marketplace; shape by listing title or description)__
| Template                                                                                                                                                            | Rating | Reviews | Shape by listing                   |
| ------------------------------------------------------------------------------------------------------------------------------------------------------------------- | ------ | ------- | ---------------------------------- |
| [Product roadmap](https://www.notion.com/templates/notion-product-roadmap?ref=notionsolutions.net) (Made by Notion)                                                 | 4.82   | 1,448   | General product or project roadmap |
| [Simple Roadmap](https://www.notion.com/templates/roadmap?ref=notionsolutions.net) (Made by Notion)                                                                 | 4.901  | 131     | Epics, sprints and bugs            |
| [Roadmap Template](https://www.notion.com/templates/roadmap-template?ref=notionsolutions.net)                                                                       | 4.824  | 102     | General product or project roadmap |
| [Rippling's Multi-Product Roadmap](https://www.notion.com/templates/ripplings-multi-product-roadmap?ref=notionsolutions.net)                                        | 4.859  | 99      | General product or project roadmap |
| [Product Roadmap](https://www.notion.com/templates/product-roadmap-template?ref=notionsolutions.net)                                                                | 4.773  | 75      | General product or project roadmap |
| [Public Roadmap with features & bug forms](https://www.notion.com/templates/notion-public-roadmap?ref=notionsolutions.net)                                          | 4.711  | 45      | Public roadmap or feedback board   |
| [Product Roadmap Timeline](https://www.notion.com/templates/product-roadmap-timeline?ref=notionsolutions.net)                                                       | 4.825  | 40      | Timeline                           |
| [Product Roadmap Planner](https://www.notion.com/templates/roadmap-s?ref=notionsolutions.net)                                                                       | 4.871  | 31      | General product or project roadmap |
| [Growth Marketing Testing Roadmap](https://www.notion.com/templates/growth-marketing-testing-roadmap-template?ref=notionsolutions.net)                              | 4.897  | 29      | Marketing roadmap                  |
| [Webflow’s Public Roadmap](https://www.notion.com/templates/webflows-public-roadmap?ref=notionsolutions.net)                                                        | 4.92   | 25      | Public roadmap or feedback board   |
| [Feedback to Roadmap](https://www.notion.com/templates/feedback-to-roadmap?ref=notionsolutions.net)                                                                 | 4.542  | 24      | Public roadmap or feedback board   |
| [Marketing Roadmap](https://www.notion.com/templates/marketing-roadmap-database?ref=notionsolutions.net)                                                            | 5.0    | 16      | Marketing roadmap                  |
| [Developers Project Roadmap](https://www.notion.com/templates/developers-project-roadmap?ref=notionsolutions.net)                                                   | 5.0    | 13      | Engineering or development         |
| [SaaS Builder Roadmap \| Product, Features, Feedback](https://www.notion.com/templates/saas-builder-roadmap-product-features-user-feedback?ref=notionsolutions.net) | 4.818  | 11      | General product or project roadmap |
| [Product Roadmap](https://www.notion.com/templates/best-product-roadmap?ref=notionsolutions.net)                                                                    | 4.8    | 10      | General product or project roadmap |
| [Product Roadmap & Goals](https://www.notion.com/templates/product-roadmap-396?ref=notionsolutions.net)                                                             | 4.7    | 10      | General product or project roadmap |

Three things follow from those numbers. Ratings barely separate the popular templates: every listing with 10 or more reviews sits within half a point of the others, and removing Notion's two doesn't move the median. A 5.0 badge mostly sits on a handful of reviews, so on its own it tells you little. And the paid listings have too few reviews to show they earn their price over the free ones, which is why I'd pick by shape and start free.

## Duplicate a roadmap template into your workspace

Notion's help on [duplicating public pages and templates](https://www.notion.com/help/duplicate-public-pages?ref=notionsolutions.net) gives a short route:

1. Log into Notion in your browser and open the template.
2. Click Duplicate in the upper right corner.
3. Choose the workspace the copy should go to.
4. Find the copy in your Private section, with all of its sub-pages.
5. Review any No access blocks. Remove those the roadmap does not need; if a missing source is essential, ask its owner for access before relying on the copy.

If the template includes a form, don't share the copied form as it is. Notion's [forms help](https://www.notion.com/help/forms?ref=notionsolutions.net) says to set up a separate version of the form from scratch, so the responses go to you and not to the original form's creator. Then open each view and check its filters and sorts, because each view keeps its own settings. I'd also delete the properties you don't plan to fill in, because empty fields make a roadmap harder to keep current.

## Build a Notion roadmap from scratch

Building your own takes one database and a handful of views. I'd build it in the order below, because each step depends on the one before: the timeline needs dates, the board needs a status, and the rollups need the relation.

[![Notion timeline with Client portal scheduled November 9–11 and Request intake November 12–14](https://storage.ghost.io/c/5c/30/5c30c46b-86a3-4d20-984f-4f6ae8ad1ed2/content/images/2026/11/notion-roadmap-timeline-20261119.webp)](https://storage.ghost.io/c/5c/30/5c30c46b-86a3-4d20-984f-4f6ae8ad1ed2/content/images/2026/11/notion-roadmap-timeline-20261119.webp?ref=notionsolutions.net)

The date range controls each bar: Client portal spans November 9–11, and Request intake spans November 12–14\. Add the dates before creating the timeline.

### 1\. A Projects database with a status and a date range

Create a database for roadmap items, whether you call them projects, features or launches, and give it three properties to start: a status for the stage, a date property that holds a range, and a select for the product, client or team each item belongs to. Give each project you want to plot a start and an end. In [Timeline settings](https://www.notion.com/help/timelines?ref=notionsolutions.net), use one date range or select separate start and end properties.

### 2\. Add the timeline

Click + next to the name of your database or your current view and select Timeline; for a timeline inline on another page, type /Timeline view. If the bars come from the wrong dates, pick the right property in the settings menu under Layout → Show timeline by. The time scale runs from hours up to years, and dragging a bar's left or right edge changes its length. The rest of the settings are in the [Notion timeline view guide](https://notionsolutions.net/notion-timeline-view/).

### 3\. Add a board grouped by status

Click + again and select Board. Because the database has a status, the board groups by it right away, and Sub-groups in the settings menu adds a second layer, which is how one board can split Now, Next and Later by product or client. The [Notion kanban board guide](https://notionsolutions.net/notion-kanban-board/) covers columns, cards and limits in more depth.

### 4\. Give each view one job

Each database view has its own settings, so a filter on the timeline doesn't follow you to the board. I'd give every view one question to answer: the timeline answers "When does it land?", the board "What are we doing now?", and a table filtered to one client or product "What's left for them?" When a filter or sort should apply to everyone who opens that view, choose Save for everyone; to send someone straight to one view, use Copy link to view. If an item you expect is missing from a view, check that view's own filter first; the guide to [tasks missing from a filtered view](https://notionsolutions.net/notion-filtered-view-missing-tasks/) traces the rule that hides it.

### 5\. Relate roadmap items to tasks

A roadmap item says what ships; the tasks say who does what. Notion's [relations and rollups help](https://www.notion.com/help/relations-and-rollups?ref=notionsolutions.net) describes this pairing directly: connect your database of tasks with your database of bigger projects to see how projects break down into tasks. Add a relation property on the Projects database that points at Tasks. Relations are one-way by default, so toggle Show on Tasks if you want the link visible from both sides, then click Add relation. Add a Rollup, select the Tasks relation and choose the task title property with Count all to count linked tasks. For the latest planned due date, choose the task due-date property with Latest date. Neither calculation confirms that all work is finished. You can also link a view of your task database from the projects database, so roadmap items and their work sit in one place.

The [Notion relations and rollups build](https://notionsolutions.net/notion-relations-and-rollups/) walks through the same setup with client and project databases, and if you want a text progress bar on each item, the [repeat() progress bar formula](https://notionsolutions.net/notion-formula-repeat-progress-bar/) draws one. If you don't have a tasks database to relate to, the [Notion project management setup](https://notionsolutions.net/notion-project-management/) builds Projects and Tasks together. Goals sit a level above the roadmap: if your items answer to quarterly objectives, keep those in their own database, which the [Notion OKR guide](https://notionsolutions.net/notion-okr/) builds.

### 6\. A template for new roadmap items

I'd give every new item the same outline, such as the problem, the scope and the open questions, so items stay comparable when you plan. Click the dropdown arrow next to New and choose + New template; a template can hold any content, sub-pages included, and it lives only in the database where you made it. If the template has a relation property, leave it empty unless every item you create from it should link to the same page, which is Notion's own advice in its [database templates help](https://www.notion.com/help/database-templates?ref=notionsolutions.net). The guide to [Notion database template defaults](https://notionsolutions.net/notion-database-template-defaults/) covers which values to preset.

## Dependencies and sub-items: add them when dates chain

Notion's [tasks and dependencies help](https://www.notion.com/help/tasks-and-dependencies?ref=notionsolutions.net) says a dependency lets you connect tasks to each other in a linear way. On a roadmap that matters only when one item can't start until another finishes, say a launch that waits on a pricing change. When you add dependencies, Notion asks how dates should shift. Say item A blocks item B:

- **Shift only when dates overlap:** B moves only when A's dates start to overlap it, so the gap between them can shrink.
- **Shift & maintain time between items:** when A's due date moves forward, B's due date moves forward by the same amount.
- **Do not automatically shift:** due dates never move on their own.

You also choose whether shifted items may start or end on weekends, then select Turn on dependencies; Avoid weekends can be switched later. I'd start with Shift only when dates overlap, because nothing moves unless two items collide. If a dependent date stays put when you expected it to move, the shift mode is the first thing to check, and the guide to [Notion dependencies not shifting dates](https://notionsolutions.net/notion-dependencies-not-shifting-dates/) walks through the rest.

Sub-items, turned on under Database settings → More settings → Sub-items → Turn on sub-items, break an epic into features and show Nested in toggle or as a Flattened list in table, list and timeline views. Deleting an item deletes its sub-items too, so move anything you want to keep before you delete a finished epic.

## An engineering roadmap: tasks, sprints and IDs

In this build, keep sprints on Tasks and the roadmap on Projects. Sprints require a task database. According to the [sprints help](https://www.notion.com/help/sprints?ref=notionsolutions.net), a task database needs a status, an assignee and a due date property. Open the settings menu, go to Database settings → More settings → Turn into Tasks, map those three properties and select Turn into task database. Before enabling sprints, note that turning them off permanently deletes the sprints database, sprint board and task-to-sprint relations. If that fits your plan, select Sprints → Turn on sprints.

That creates two things. A Sprint board holds three views: Current Sprint for the tasks in this sprint, Sprint planning for the current, next and last sprint plus any tasks without a sprint, and Backlog for tasks without a sprint. A Sprints database lists the sprints themselves and includes a Timeline view. Each sprint can run from one to eight weeks.

A roadmap kept on its own Projects database stays separate from the sprint database and board. I'd keep it that way: the roadmap says what ships each quarter, and the sprints say what the team does this cycle.

For tickets people will mention in chat or commits, add an ID property. Every existing and future item gets a unique ID, and ID numbers never change. Choose Add ID prefix when you set it up, because ID URLs only work when the ID has a prefix.

## Publish a public roadmap as its own page

A filter is not a privacy control on a published database. Notion's [publishing help](https://www.notion.com/help/public-pages-and-web-publishing?ref=notionsolutions.net) says that if your site contains a database, "viewers can toggle between views and open the pages within," and publishing a page to the web publishes all of its subpages too. Publish your internal roadmap with a tidy filtered view on top, and visitors can still switch to the view with your internal notes. So the public roadmap gets its own page or database, holding only what you'd say to a customer: the item, its stage and a line of description. I'd keep estimates, owners and internal notes off it entirely.

Subpages are published by default, and you can restrict subpage permissions to hide one. Before publishing, check four things:

- **Contributor details.** The page's metadata includes "the names, profile photos, and email addresses associated with any Notion users that have contributed to the page." That also applies when a page is shared with Anyone on the web with link, so check who has edited it.
- **Copying.** With Duplicate as template on, visitors can duplicate your site as a page in their own workspace. To turn it off, go to Share → Publish → Site customization → Header, toggle off Duplicate as template and select Publish changes.
- **Search.** Search engine indexing → Discoverable on the web makes the site searchable, and Notion says Sites can take up to four weeks to be indexed and appear in search results.
- **Workspace rules.** On an Enterprise plan, workspace owners can stop members from publishing sites.

To publish it, open Share, go to the Publish tab and select Publish. Open the site while signed out, switch between available views, and check which subpages and records visitors can open. The site updates automatically as you edit the page.

Taking it down has two parts. Open Share → Publish → Unpublish, then open Share again and, if the page still shows Anyone on the web with link, open that dropdown and choose Remove. For a custom domain and the rest of Notion Sites, the [Notion website guide](https://notionsolutions.net/notion-website/) covers the full setup.

## Collect feature requests with a form

A Notion form lets customers ask for features without a Notion account. Notion's [forms help](https://www.notion.com/help/forms?ref=notionsolutions.net) says forms collect answers even from people who aren't part of your workspace or don't use Notion at all, and all members on all plans can create them. Each question is connected to a property in the database, so every response arrives as a row you can sort, filter and weigh against the roadmap.

To create one, type /form on a page, or click + next to the views of an existing requests database and choose Form; that second route needs Full access to the database. Creating and customizing a form happen in Notion's desktop and web apps. Under Share form → Who can fill out, Anyone on the web with link opens the form to the public, and responses under that setting are automatically anonymous, so add an email question if you want to reply. No access closes the form. Conditional logic, which shows questions based on earlier answers, needs a Business or Enterprise plan.

Point the form at an internal requests database, not at the published roadmap: a response becomes a page in its database, and a published database lets visitors open its pages. Test the shared form while signed out with a sample request. Check that the response arrived in the internal requests database. Then decide which requests reach the roadmap and what you tell the person who asked. If you'd rather collect requests through Tally, Typeform or Google Forms, the guide to [connecting a form to a Notion database](https://notionsolutions.net/notion-connect-form-to-database/) compares those routes.

[![Notion Product feature request form builder with Preview and Share form controls.](https://storage.ghost.io/c/5c/30/5c30c46b-86a3-4d20-984f-4f6ae8ad1ed2/content/images/2026/11/notion-roadmap-form-builder-desktop.webp)](https://storage.ghost.io/c/5c/30/5c30c46b-86a3-4d20-984f-4f6ae8ad1ed2/content/images/2026/11/notion-roadmap-form-builder-desktop.webp?ref=notionsolutions.net)

Preview checks the respondent’s view. Use Share form to choose who can submit requests; the example is still restricted to workspace members.

## What Notion documents about each roadmap piece

The table gathers the behavior that shapes a roadmap build, each row from the Notion help page linked in it.

__Roadmap building blocks, from Notion's help pages__
| Piece              | What Notion documents                                                                                                                                                                                                                                                                                  | What it means for your roadmap                              |
| ------------------ | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ | ----------------------------------------------------------- |
| Timeline           | Uses a date range or separate start and end date properties ([Timelines](https://www.notion.com/help/timelines?ref=notionsolutions.net))                                                                                                                                                               | Set both dates for the projects you want to plot            |
| Board              | Groups by a status property by default; Sub-groups adds a second layer ([Boards](https://www.notion.com/help/boards?ref=notionsolutions.net))                                                                                                                                                          | Now, Next, Later columns, split by product or client        |
| Views              | Each view has its own settings; Save for everyone applies a filter or sort for everyone in that view ([Views, filters and sorts](https://www.notion.com/help/views-filters-and-sorts?ref=notionsolutions.net))                                                                                         | One job per view, saved for the team                        |
| Relations          | One-way by default; Show on \[related database\] makes them two-way ([Relations and rollups](https://www.notion.com/help/relations-and-rollups?ref=notionsolutions.net))                                                                                                                               | See the roadmap item from each task                         |
| Database templates | A filled relation links every new page from that template to the same page ([Database templates](https://www.notion.com/help/database-templates?ref=notionsolutions.net))                                                                                                                              | Leave the relation empty                                    |
| Dependencies       | Three date-shifting modes plus an option to keep shifted items off weekends ([Tasks and dependencies](https://www.notion.com/help/tasks-and-dependencies?ref=notionsolutions.net))                                                                                                                     | Start with Shift only when dates overlap                    |
| Sub-items          | Deleting an item deletes its sub-items ([Tasks and dependencies](https://www.notion.com/help/tasks-and-dependencies?ref=notionsolutions.net))                                                                                                                                                          | Move sub-items before you delete an epic                    |
| Sprints            | Turning sprints off permanently deletes the sprints database, sprint board and task-to-sprint relations ([Sprints](https://www.notion.com/help/sprints?ref=notionsolutions.net))                                                                                                                       | Keep the roadmap on its own projects database               |
| ID property        | ID numbers never change; ID URLs work only with a prefix ([Sprints](https://www.notion.com/help/sprints?ref=notionsolutions.net))                                                                                                                                                                      | Add the prefix when you add the ID                          |
| Publishing         | Subpages publish too; visitors can switch views and open pages; metadata includes contributors' names, profile photos and email addresses; indexing can take up to four weeks ([Public pages and web publishing](https://www.notion.com/help/public-pages-and-web-publishing?ref=notionsolutions.net)) | A separate public page, checked before you share it         |
| Forms              | Open to people outside the workspace; Anyone on the web with link responses are anonymous; conditional logic on Business or Enterprise ([Forms](https://www.notion.com/help/forms?ref=notionsolutions.net))                                                                                            | Ask for an email and point the form at an internal database |
| Duplicating        | The copy lands in Private with its sub-pages; unneeded No access blocks can be removed ([Duplicate public pages](https://www.notion.com/help/duplicate-public-pages?ref=notionsolutions.net))                                                                                                          | Rebuild any copied form from scratch before sharing         |

## If you meant Notion's own roadmap

If you were looking for Notion's own product roadmap, the place Notion announces what it ships is its [releases page](https://www.notion.com/releases?ref=notionsolutions.net).

## Which Notion roadmap to set up first

Pick the shape, then the template. For most teams I'd start with the free Product roadmap made by Notion: it carries most of the reviews, ratings don't separate it from the alternatives, and the paid listings in the comparison sample have too few reviews to justify starting with one.

- Dated launches across quarters: a timeline on a projects database with a date range.
- Priorities without firm dates: a board grouped by a Now, Next, Later status.
- Engineering work in cycles: a task database with sprints, decided on before you try them, because turning sprints off deletes them.
- Customers asking what's next: a separate public page plus a request form.

Keep the public roadmap apart from the internal one, and check contributor metadata before you publish. Turn on dependencies only when dates really chain, starting with Shift only when dates overlap. If your roadmap is really a board of cards with nothing behind them, read the [Notion vs Trello comparison](https://notionsolutions.net/notion-vs-trello/) before you build.

### A trial path

This order keeps the steps that are hard to undo for last:

1. Duplicate the free Product roadmap.
2. Copy a few representative projects into it for the planning trial.
3. Add the timeline and a status board.
4. Run one planning cycle on it.
5. Only then add task relations, sprints or a public page.